A line that turns out seventy-two a year at a 6% rework rate produces surplus, and surplus is what lets you be selective. Every analytic carried a risk score, a confidence rating and a technique mapping — not because RBA demanded extra paperwork, but because the definition of done had required it since March.
Alert volume down about two-thirds. Coverage of prioritised techniques: measured monthly, trending. Time from we should detect that to we do detect that: eleven days, predictable.
And the honest part. Nobody worked harder. Lead time fell because waiting fell; output rose only because rework stopped consuming capacity twice. The one claim that stayed a hypothesis — that better coverage means catching the next intruder sooner — was written down and dated rather than promised.
Then they pointed the same eleven-step decomposition at threat-intel intake, the analyst tuning path, and exception handling. The same four shapes appeared every time: a queue nobody owned, a wait causing a defect downstream, a batching habit, a missing decision rule. The programme was not slow in a hundred original ways.